УКР ENG

Search:


Email:  
Password:  

 REGISTRATION CERTIFICATE

KV #19905-9705 PR dated 02.04.2013.

 FOUNDERS

RESEARCH CENTRE FOR INDUSTRIAL DEVELOPMENT PROBLEMS of NAS (KHARKIV, UKRAINE)

According to the decision No. 802 of the National Council of Television and Radio Broadcasting of Ukraine dated 14.03.2024, is registered as a subject in the field of print media.
ID R30-03156

 PUBLISHER

Liburkina L. M.

 SITE SECTIONS

Main page

Editorial staff

Editorial policy

Annotated catalogue (2011)

Annotated catalogue (2012)

Annotated catalogue (2013)

Annotated catalogue (2014)

Annotated catalogue (2015)

Annotated catalogue (2016)

Annotated catalogue (2017)

Annotated catalogue (2018)

Annotated catalogue (2019)

Annotated catalogue (2020)

Annotated catalogue (2021)

Annotated catalogue (2022)

Annotated catalogue (2023)

Annotated catalogue (2024)

Thematic sections of the journal

Proceedings of scientific conferences


Analyzing the Problems of Develoment of Nuclear, Thermal and Renewable Energy in Terms of the Electric Power System of Ukraine
Vinnychenko O. V.

Vinnychenko, Olena V. (2020) “Analyzing the Problems of Develoment of Nuclear, Thermal and Renewable Energy in Terms of the Electric Power System of Ukraine.” Business Inform 11:132–138.
https://doi.org/10.32983/2222-4459-2020-11-132-138

Section: Industrial Economics

Article is written in Ukrainian
Downloads/views: 0

Download article (pdf) -

UDC 330.34

Abstract:
In order to research the process of development of the energy systems of Ukraine, the current status and problems of development of nuclear, thermal and renewable energy are analyzed. The global trends in the development of nuclear energy is identified and it is noted that after the short-term decline caused by the accident at the «Fukushima-1» nuclear power plant, a gradual increase in the number of operating reactors has begun. The crisis situation in the nuclear and thermal energy market is outlined. Within the framework of the existing PSO (Public Service Obligation) model, the National nuclear power generating company «Energoatom» suffers significant losses. The limitation of electrical energy production at nuclear power plants in 2020 is an insufficiently grounded measure that will adversely affect the energy security of the country. Shutting down the power units of nuclear plants means that instead of producing energy one begins to consume energy, while a constant duty with ongoing servicing of equipment and maintaining the security systems is required. It is indicated that the coal-fired power plants of Ukraine have already developed their estimated resource and have an extremely low usage rate of installed capacity. In addition, coal-fired power plants in Ukraine are used in maneuvering modes, to cover peak loads, which leads to accelerated wear and tear of equipment and reduces production efficiency. A comparative analysis of the development of renewable energy sources (RES) is carried out and it is proved that the increase in electrical energy production due to RES requires the development of sufficient maneuvering capacities. The current situation indicates that the capacities of HPP and PHES are not sufficient, so at this time coal-fired power plants are used for such purposes, but such a part-time mode of operation leads to further wear and tear of equipment and an increase in emergency situations.

Keywords: electrical energy, nuclear energy, thermal energy, renewable energy sources.

Fig.: 1. Tabl.: 3. Bibl.: 11.

Vinnychenko Olena V. – Candidate of Sciences (Economics), Associate Professor, Associate Professor, Department of Finance, Accounting and Business Security, Kharkiv National University of Civil Engineering and Architecture (40 Sumska Str., Kharkіv, 61000, Ukraine)
Email: [email protected]

List of references in article

“Enerhetyka Ukrainy“ [Energy of Ukraine]. Derzhavna sluzhba statystyky Ukrainy. http://www.ukrstat.gov.ua/operativ/menu/menu_u/energ.htm
“World Statistics. Operational & Long-Term Shutdown Reactors“. https://pris.iaea.org/PRIS/WorldStatistics/OperationalReactorsByCountry.aspx
Nosovskyi, A. V. “Shchodo perspektyv budivnytstva novykh atomnykh elektrychnykh stantsii“ [On the Prospects for the Construction of New Nuclear Power Plants]. Yaderna enerhetyka ta dovkillia, no. 3 (2019): 3-14. DOI: https://doi.org/10.31717/2311-8253.19.3.1
Azarov, S. I., Sydorenko, V. L., and Zadunai, O. S. “Ohliad stanu svitovoi atomnoi enerhetyky“ [Overview of the State of the World Nuclear Power Engineering]. Problemy zahalnoi enerhetyky, no. 1 (2019): 24-30. DOI: https://doi.org/10.15407/pge2019.01.024
Nosovskyi, A. V. “Deiaki problemni pytannia v yadernii enerhetychnii haluzi Ukrainy“ [Some Issues in the Nuclear Energy Sector of Ukraine]. Yaderna enerhetyka ta dovkillia, no. 3 (2020): 5-9. DOI: https://doi.org/10.31717/2311-8253.20.3.1
Dubrovskyi, V. V., and Shraiber, O. A. “Svitovi tendentsii rozvytku vuhilnoi teplovoi heneratsii ta yikh vplyv na enerhetyku Ukrainy“ [World Trends in the Development of Coal-Fired Thermal Generation and their Influence on the Energy of Ukraine]. Problemy zahalnoi enerhetyky, no. 2 (2020): 11-16. DOI: https://doi.org/10.15407/pge2020.02.011
Obukh, V. “30 mlrd dolariv: shchob ukrainski TES buly taki, yak yevropeiski“ [$ 30 Billion: To Make Ukrainian TPPs Like European Ones]. https://www.ukrinform.ua/rubric-economy/2593914-30-mlrddolariv-sob-ukrainski-tes-buli-taki-ak-evropejski.html
Buratynskyi, I. M. “Analiz zastosuvannia system akumuliuvannia elektroenerhii v enerhosystemakh z velykym obsiahom vidnovliuvalnykh dzherel enerhii“ [Analisis of the Use of Electric Energy Storage Systems in Power Systems with a Large Volume of Renewable Energy Sources]. Problemy zahalnoi enerhetyky, no. 4 (2019): 63-70. DOI: https://doi.org/10.15407/pge2019.04.063
[Legal Act of Ukraine] (2003). https://zakon.rada.gov.ua/laws/show/555-15#Text
[Legal Act of Ukraine] (2017). http://zakon3.rada.gov.ua/laws/show/2019-19#Text
“«Enerhoatom» vidreahuvav na mozhlyve zoboviazannia prodavaty deshevu elektroenerhiiu «HarPoku» u 2021 rotsi“ [Energoatom Has Responded to a Possible Commitment to Sell Cheap Electricity to GarPok in 2021]. Ekonomichna pravda. https://www.epravda.com.ua/news/2020/12/15/669186/

 FOR AUTHORS

License Contract

Conditions of Publication

Article Requirements

Regulations on Peer-Reviewing

Publication Contract

Current Issue

Frequently asked questions

 INFORMATION

The Plan of Scientific Conferences


 OUR PARTNERS


Journal «The Problems of Economy»

  © Business Inform, 1992 - 2024 The site and its metadata are licensed under CC BY-SA. Write to webmaster